LIKE FACEBOOK

Tweet Feed

Instagram Feed

  • Had a chance to see STS6 Model Tensioners being made at #hiforce headquarters #tensioners #winshawhydraulictools
  • Structural bolt tightening works were carried out on a 50 metre cycle track bridge in Malaysia using Hi-Force TWP22S pneumatic torque multiplier with respective sockets. A total of 568 bolts were tightened within three days and involved tightening of M24, M27 and M30 bolts to a specific torque. #hiforce #bolttightening #torqueing #torquemultiplier
  • Lifting the rear of Saipem FDS2 pipelayer vessel to carry out repair works #hiforce #cylinders #shiprepair
  • Bolt torqueing works at Bloomberg site in London  #hiforce #torquewrench #bolttightening
  • Introducing BOLTRIGHT PRO - the innovative bolted joint integrity software from Hi-Force. Visit www.hi-force.com for more details. #hiforce #boltingtools #boltrightpro
  • Maintenance works carried out on tidal bridges at Richards Bay Coal Terminal in South Africa  #hiforce  #hydrauliccylinders
  • Synchronous lifting of a road bridge in Scotland  #hiforce #HSPsplitflowpump #PLCcontrolsystem
  • Introducing BOLTRIGHT PRO - the innovative bolted joint integrity software from Hi-Force. Visit www.hi-force.com for more details. #hiforce #boltingtools #boltrightpro
  • Bolt torqueing works at Bloomberg site in London  #hiforce #torquewrench #bolttightening
  • Lifting the rear of a Saipem FDS2 pipelayer vessel to carry out repair works http://ow.ly/4n1FCo  #hiforce #cylinders #shiprepair
  • Structural bolt tightening works were carried out on a 50 metre cycle track bridge in Malaysia using Hi-Force TWP22S pneumatic torque multiplier with respective sockets. A total of 568 bolts were tightened within three days and involved tightening of M24, M27 and M30 bolts to a specific torque. #hiforce #bolttightening #torqueing #torquemultiplier
  • International airport terminal construction at Incheon, South Korea  #hiforce #customisedcylinders #HEPpumps
  • Yüksek debili, kapalı fan soğutmalı ve sessiz çalışma özelliği ile harici ve dahili kullanıma uygun
  • Presle monte edilmiş parçaların, tekerleklerin, dişlilerin, cer dişlilerinin, makaraların vb. gibi birçok parçanın sökülmesi işinde kullanılabilen
  • En zor civatalama işlemlerinin bile doğru ve hızlı bir şekilde yapılmasına imkan veren, bağlantı için kullanılan kare başlık tipi ile hızlı bir şekilde aparat sökme ve takma yapılmasını sağlayan, kompakt, hafif, alüminyum ve 360 derece dönebilen bağlantı noktası ile

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints

Leak Free Connections of Bolted Joints with Hi-Force Bolting Tools

Hi-Force was contracted to supervise and certify leak free bolt tightening of 17,000 bolted joints at a refinery in Bulgaria, through authorized Bulgarian distributor, Euromarket.

Hi-Force Global Head of Bolting, Patrick Wright, delivered the approved Engineering Construction Industry Training Board (ECITB) Mechanical Joint Integrity (MJI) 10, 18 & 19 training courses to the bolting specialists as well as supplied them with bolt load and bolt stress calculations for all on-site mechanical joints to assist them with their scope of work.

The client purchased several Hi-Force bolting equipment to carry out the bolting works which included; TWS-N and TWH-N hydraulic torque wrenches, TPA and TPE torque wrench pumps, hand torque wrenches, torque multipliers, sockets, ratchet heads, STS hydraulic bolt tensioners, bolt tensioning pumps and hoses and other accessories. 

The Hi-Force team remained on site throughout the entire process from start up of the refinery and until hand over to the refinery’s owners, and in total recorded 13,680 hours of onsite supervision to ensure 100% leak free bolting was achieved. The Hi-Force team also provided full Flange Management data records to assist with future on-site maintenance at the refinery.