LIKE FACEBOOK

Tweet Feed

Instagram Feed

  • Had a chance to see STS6 Model Tensioners being made at #hiforce headquarters #tensioners #winshawhydraulictools
  • Structural bolt tightening works were carried out on a 50 metre cycle track bridge in Malaysia using Hi-Force TWP22S pneumatic torque multiplier with respective sockets. A total of 568 bolts were tightened within three days and involved tightening of M24, M27 and M30 bolts to a specific torque. #hiforce #bolttightening #torqueing #torquemultiplier
  • Lifting the rear of Saipem FDS2 pipelayer vessel to carry out repair works #hiforce #cylinders #shiprepair
  • Bolt torqueing works at Bloomberg site in London  #hiforce #torquewrench #bolttightening
  • Introducing BOLTRIGHT PRO - the innovative bolted joint integrity software from Hi-Force. Visit www.hi-force.com for more details. #hiforce #boltingtools #boltrightpro
  • Maintenance works carried out on tidal bridges at Richards Bay Coal Terminal in South Africa  #hiforce  #hydrauliccylinders
  • Synchronous lifting of a road bridge in Scotland  #hiforce #HSPsplitflowpump #PLCcontrolsystem
  • Introducing BOLTRIGHT PRO - the innovative bolted joint integrity software from Hi-Force. Visit www.hi-force.com for more details. #hiforce #boltingtools #boltrightpro
  • Bolt torqueing works at Bloomberg site in London  #hiforce #torquewrench #bolttightening
  • Lifting the rear of a Saipem FDS2 pipelayer vessel to carry out repair works http://ow.ly/4n1FCo  #hiforce #cylinders #shiprepair
  • Structural bolt tightening works were carried out on a 50 metre cycle track bridge in Malaysia using Hi-Force TWP22S pneumatic torque multiplier with respective sockets. A total of 568 bolts were tightened within three days and involved tightening of M24, M27 and M30 bolts to a specific torque. #hiforce #bolttightening #torqueing #torquemultiplier
  • International airport terminal construction at Incheon, South Korea  #hiforce #customisedcylinders #HEPpumps
  • Yüksek debili, kapalı fan soğutmalı ve sessiz çalışma özelliği ile harici ve dahili kullanıma uygun
  • Presle monte edilmiş parçaların, tekerleklerin, dişlilerin, cer dişlilerinin, makaraların vb. gibi birçok parçanın sökülmesi işinde kullanılabilen
  • En zor civatalama işlemlerinin bile doğru ve hızlı bir şekilde yapılmasına imkan veren, bağlantı için kullanılan kare başlık tipi ile hızlı bir şekilde aparat sökme ve takma yapılmasını sağlayan, kompakt, hafif, alüminyum ve 360 derece dönebilen bağlantı noktası ile

Rehabilitation of Tidal Bridge in South Africa

Rehabilitation of Tidal Bridge

Rehabilitation of Tidal Bridge

Rehabilitation of Tidal Bridge

Rehabilitation of Tidal Bridge

Rehabilitation of Tidal Bridge

Rehabilitation of Tidal Bridge

HFG4006 cylinders used to carry out maintenance works on the tidal bridge

Hi-Force South Africa supplied 16 HFG4006 failsafe lock ring cylinders and 1 HEP207212 electric driven pump to Transnet Freight Rail through South African distributors, Renttech and FE Industrial Supplies, to carry out maintenance works on the tidal bridge.

The tidal bridge, which links the mainland to Richards Bay Coal Terminal at the port, has been in the region for over 20 years and required maintenance work to be carried out on the bearings. The bearings were cast in a protective concrete pillar and had a 600mm gap between the main supporting structure and the bridge. With the equipment supplied and supervision by the Hi-Force team, Transnet were successfully able to lift the bridge off the supports and replace the bearings.

Hi-Force South Africa also provided training to Transnet staff on the safe use and operation of the equipment as well as offered technical information on the bridge lift.