LIKE FACEBOOK

Tweet Feed

Instagram Feed

  • Had a chance to see STS6 Model Tensioners being made at #hiforce headquarters #tensioners #winshawhydraulictools
  • Structural bolt tightening works were carried out on a 50 metre cycle track bridge in Malaysia using Hi-Force TWP22S pneumatic torque multiplier with respective sockets. A total of 568 bolts were tightened within three days and involved tightening of M24, M27 and M30 bolts to a specific torque. #hiforce #bolttightening #torqueing #torquemultiplier
  • Lifting the rear of Saipem FDS2 pipelayer vessel to carry out repair works #hiforce #cylinders #shiprepair
  • Bolt torqueing works at Bloomberg site in London  #hiforce #torquewrench #bolttightening
  • Introducing BOLTRIGHT PRO - the innovative bolted joint integrity software from Hi-Force. Visit www.hi-force.com for more details. #hiforce #boltingtools #boltrightpro
  • Maintenance works carried out on tidal bridges at Richards Bay Coal Terminal in South Africa  #hiforce  #hydrauliccylinders
  • Hi-Force ToughLift model TLA10021 lifts Caterpillar 785C Rock trucks at the mines in North East Michigan #hiforce #toughlift
  • The new and improved Toughlifts from Hi-Force #hiforce #toughlift
  • Synchronous lifting of a road bridge in Scotland  #hiforce #HSPsplitflowpump #PLCcontrolsystem
  • Introducing BOLTRIGHT PRO - the innovative bolted joint integrity software from Hi-Force. Visit www.hi-force.com for more details. #hiforce #boltingtools #boltrightpro
  • Bolt torqueing works at Bloomberg site in London  #hiforce #torquewrench #bolttightening
  • Lifting the rear of a Saipem FDS2 pipelayer vessel to carry out repair works http://ow.ly/4n1FCo  #hiforce #cylinders #shiprepair
  • Structural bolt tightening works were carried out on a 50 metre cycle track bridge in Malaysia using Hi-Force TWP22S pneumatic torque multiplier with respective sockets. A total of 568 bolts were tightened within three days and involved tightening of M24, M27 and M30 bolts to a specific torque. #hiforce #bolttightening #torqueing #torquemultiplier
  • International airport terminal construction at Incheon, South Korea  #hiforce #customisedcylinders #HEPpumps
  • Yüksek debili, kapalı fan soğutmalı ve sessiz çalışma özelliği ile harici ve dahili kullanıma uygun
  • Presle monte edilmiş parçaların, tekerleklerin, dişlilerin, cer dişlilerinin, makaraların vb. gibi birçok parçanın sökülmesi işinde kullanılabilen
  • En zor civatalama işlemlerinin bile doğru ve hızlı bir şekilde yapılmasına imkan veren, bağlantı için kullanılan kare başlık tipi ile hızlı bir şekilde aparat sökme ve takma yapılmasını sağlayan, kompakt, hafif, alüminyum ve 360 derece dönebilen bağlantı noktası ile

Company News

onsite

On-site Bolting Solutions

18 Sep 2017

Hi-Force is able to offer bespoke on-site bolting services designed to maintain the integrity of bolted joints across multiple industries, where the safe movement of hydrocarbons in a leak free environment is absolutely critical. 

To complement Hi-Force’s extensive range of bolting tools, our on-site bolting services are tailored to suit unique customer requirements. Customers can select the required support which extends to manpower, supervision and training from our highly competent team of technicians, tool sale or rental agreements, as well as our innovative bolted joint integrity software, BoltRight Pro and Flange Management database. Our flexible approach to offering clients the individual components of our on-site service capabilities ensures a cost-effective and satisfactory service. 

Our on-site bolting containers offer an on-site storage of purchased or leased bolting equipment, an ECITB approved training rig for on-site training and demonstration purposes as well as a repair facility for any service and maintenance required for the tools during their time on site, limiting costly time delays. Our on-site containers includes appropriate tool storage facilities, an air condition environment, on-site training equipment, compressed air and a wide range of spare parts and additional tooling. 

  • Full technical support and advice during pre-construction phase
  • Tooling specification for correct tightening of all bolts and joints, available for both purchase and rental
  • Special tooling for unique customer requirements, designed and manufactured by Hi-Force engineers
  • Bolting software and Flange Management Database
  • Fully equipped, purpose designed and air conditioned on-site tool store container 
  • Air conditioned repair and training container, complete with ECITB approved training rig for on-site training and demonstration purposes as well as repair and maintenance facilities, limiting costly time delays
  • Qualified and experienced onsite Bolting Crews, Supervisors and Trainers
  • ECITB approved training for contractors bolting crews available