• About Us
  • Resources
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • English US
    English UKItalianChineseSpanish
  • Products
  • Services
  • Projects
Go Back

Projects

  • HS2 utilises Hi-Force’s synchronised lifting systems for M42 bridge installation
  • Maintenance of haul trucks at a copper mine in Chile
  • Bolting Works at a Gas Compressor Station
  • Synchronous Elevation of the Jiboa Bridge In El Salvador
  • Leak Free Connections of Bolted Joints
  • Rehabilitation of Tidal Bridge in South Africa
  • Bolt Tightening Works at Lekir Bulk Terminal
  • HFG5006 cylinders used to lift vessel
  • Synchronous Lifting of a Road Bridge
  • Flange Bolting at Petrochemical Plants in Azerbaijan
  • The Thames Tideway Tunnel Project
  • Bolt Tensioning in Kuwait
  • Customised 1012 tonne capacity cylinders
  • Railway Bridge Project in Amsterdam
  • Manufacturing of HHR5008 hollow cylinders
  • Maintenance on Wind Turbines
  • Specialist Skates for Babcock International
  • Toughlifts in Mozambique
  • Double acting cylinders for workshop press
proj5-5
proj5-4
proj5-2
proj5-6
proj5-3

HFG5006 cylinders used to lift vessel

HFG cylinders lift 33,622 tonne vessel 

The rear of a Saipem FDS2 pipelayer vessel, weighing more than 33,000 tonnes was successfully lifted using 8 HFG5006 single acting failsafe lock ring cylinders, driven by two HEP517362 electric driven pumps.

The cylinders and support structures were initially placed in the dry dock. Divers then assisted the positioning of the vessel over the correct lifting points to keep the vessel level, using the failsafe lock ring cylinders.