LIKE FACEBOOK

Tweet Feed

Instagram Feed

  • Had a chance to see STS6 Model Tensioners being made at #hiforce headquarters #tensioners #winshawhydraulictools
  • Structural bolt tightening works were carried out on a 50 metre cycle track bridge in Malaysia using Hi-Force TWP22S pneumatic torque multiplier with respective sockets. A total of 568 bolts were tightened within three days and involved tightening of M24, M27 and M30 bolts to a specific torque. #hiforce #bolttightening #torqueing #torquemultiplier
  • Lifting the rear of Saipem FDS2 pipelayer vessel to carry out repair works #hiforce #cylinders #shiprepair
  • Bolt torqueing works at Bloomberg site in London  #hiforce #torquewrench #bolttightening
  • Introducing BOLTRIGHT PRO - the innovative bolted joint integrity software from Hi-Force. Visit www.hi-force.com for more details. #hiforce #boltingtools #boltrightpro
  • Maintenance works carried out on tidal bridges at Richards Bay Coal Terminal in South Africa  #hiforce  #hydrauliccylinders
  • Hi-Force ToughLift model TLA10021 lifts Caterpillar 785C Rock trucks at the mines in North East Michigan #hiforce #toughlift
  • The new and improved Toughlifts from Hi-Force #hiforce #toughlift
  • Synchronous lifting of a road bridge in Scotland  #hiforce #HSPsplitflowpump #PLCcontrolsystem
  • Introducing BOLTRIGHT PRO - the innovative bolted joint integrity software from Hi-Force. Visit www.hi-force.com for more details. #hiforce #boltingtools #boltrightpro
  • Bolt torqueing works at Bloomberg site in London  #hiforce #torquewrench #bolttightening
  • Lifting the rear of a Saipem FDS2 pipelayer vessel to carry out repair works http://ow.ly/4n1FCo  #hiforce #cylinders #shiprepair
  • Structural bolt tightening works were carried out on a 50 metre cycle track bridge in Malaysia using Hi-Force TWP22S pneumatic torque multiplier with respective sockets. A total of 568 bolts were tightened within three days and involved tightening of M24, M27 and M30 bolts to a specific torque. #hiforce #bolttightening #torqueing #torquemultiplier
  • International airport terminal construction at Incheon, South Korea  #hiforce #customisedcylinders #HEPpumps
  • Yüksek debili, kapalı fan soğutmalı ve sessiz çalışma özelliği ile harici ve dahili kullanıma uygun
  • Presle monte edilmiş parçaların, tekerleklerin, dişlilerin, cer dişlilerinin, makaraların vb. gibi birçok parçanın sökülmesi işinde kullanılabilen
  • En zor civatalama işlemlerinin bile doğru ve hızlı bir şekilde yapılmasına imkan veren, bağlantı için kullanılan kare başlık tipi ile hızlı bir şekilde aparat sökme ve takma yapılmasını sağlayan, kompakt, hafif, alüminyum ve 360 derece dönebilen bağlantı noktası ile

Bolt Integrity and flange management in Brazil

proj2-2

Flange management

proj2-1

Flange management

Odebrecht is the largest EPC contractor in the Oil and Gas market within Latin America. One of its subsidiary companies, Braskem, is also the largest petrochemicals producer in Latin America.

Although employing over 168,000 people, Bolt integrity and flange management is still a process that Odebrecht need to outsource to specially trained technicians. 

Hi-Force Official Distributor in Brazil, LKL Servicos, has circa 42 skilled technicians contracted year-round with Odebrecht to undertake bolting and flange management, and also supplies hire and direct sales of Hi-Force Hydraulic tooling throughout all of their ongoing contracts with Odebrecht.

A specially designated LKL Engineer also works closely with the Engineering department at Odebrecht utilizing Hi-Force’s BoltRight software to give a fully accountable Flange Management system for all ongoing operations. 

The Extensive training that all our distributors receive, allowed LKL to back up the quality of Hi-Force Torque Wrenches and Tensioners, with highly skilled technicians allowing them to offer the much needed full service to Odebrecht.