• About Us
  • Resources
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • English UK
    English USItalianChineseSpanish
  • Products
  • Services
  • Projects
Go Back

Projects

  • HS2 utilises Hi-Force’s Synchronised Lifting Systems for M42 bridge installation
  • Construction of a new ammonia production facility in Slovakia
  • Plant shutdown maintenance works in Slovakia
  • Maintenance of haul trucks at a copper mine in Chile
  • Bolting Works at a Gas Compressor Station
  • Synchronous Elevation of the Jiboa Bridge In El Salvador
  • Bolt Tightening Works at Lekir Bulk Terminal
  • Leak Free Connections of Bolted Joints
  • HFG5006 cylinders used to lift vessel
  • Rehabilitation of Tidal Bridge in South Africa
  • Synchronous Lifting of a Road Bridge
  • Bolt Tensioning in Kuwait
  • The Thames Tideway Tunnel Project
  • Flange Bolting at Petrochemical Plants in Azerbaijan
  • Railway Bridge Project in Amsterdam
  • Customised 1012 tonne capacity cylinders
  • Maintenance on Wind Turbines
  • Specialist Skates for Babcock International
  • Toughlifts in Mozambique
  • Double acting cylinders for workshop press
  • Manufacturing of HHR5008 hollow cylinders
TL 825

Maintenance of haul trucks at a copper mine in Chile

Protorq, Hi-Force Chilean distributor, supplied several TLA ToughLift jacking system units including TLA15015, TLA20015 and TLA20027 as well as load block sets to BAILAC, a mining services and solutions company responsible for the maintenance and replacement of tyres on the haul trucks operating at Los Bronces copper mine in Chile.

Protorq and Hi-Force personnel also visited the mine site to conduct a training on the safe and correct use of hydraulic tools for the BAILAC staff operating the Toughlifts.