• About Us
  • Resources
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • English UK
    English USItalianChineseSpanish
  • Products
  • Services
  • Projects
Go Back

Projects

  • HS2 utilises Hi-Force’s Synchronised Lifting Systems for M42 bridge installation
  • Construction of a new ammonia production facility in Slovakia
  • Plant shutdown maintenance works in Slovakia
  • Maintenance of haul trucks at a copper mine in Chile
  • Bolting Works at a Gas Compressor Station
  • Synchronous Elevation of the Jiboa Bridge In El Salvador
  • Bolt Tightening Works at Lekir Bulk Terminal
  • Leak Free Connections of Bolted Joints
  • HFG5006 cylinders used to lift vessel
  • Rehabilitation of Tidal Bridge in South Africa
  • Synchronous Lifting of a Road Bridge
  • Bolt Tensioning in Kuwait
  • The Thames Tideway Tunnel Project
  • Flange Bolting at Petrochemical Plants in Azerbaijan
  • Railway Bridge Project in Amsterdam
  • Customised 1012 tonne capacity cylinders
  • Maintenance on Wind Turbines
  • Specialist Skates for Babcock International
  • Toughlifts in Mozambique
  • Double acting cylinders for workshop press
  • Manufacturing of HHR5008 hollow cylinders
proj3-4
proj3-3

Bolt Tensioning in Kuwait

A team of Hi-Force onsite engineers were deployed to Kuwait to carry out 50% tensioning on a flange, with a diameter of over 10 meters. 78 STS6 Hi-Force bolt tensioners were used on the 156 bolt flange, powered by two AHP275BTU air driven pumps. The bolt sizes on the flange were 3 ½”.  The project, commissioned by Equate Petrochemical company of Kuwait, involved the largest reactor in the Middle East. A total of 10 Hi-Force onsite engineers spend two days tensioning the flange.